- Home
- Knowledge Base
- Product Schedules by GSP
- Customizing The App
- Enabling & Configuring Batch Schedule Creation
Enabling & Configuring Batch Schedule Creation
By default, Schedule Batching is not enabled. To enable it, a system administrator must define the batch threshold, i.e., the number of Opportunity Products that can be scheduled/rescheduled simultaneously before the batch is used.
To do so, take the following steps:
- Navigate to Setup.
- In the Quick Find Bar, search for Custom Metadata Types.
- Click on Custom Metadata Types.
- Find Product Schedule Settings and click Manage Records.
- Your org should contain a record named Default. If it does, click the Edit link. If it doesn’t, click New and enter Default as the Label and Product Schedule Settings Name.
- Set the Schedule Batch Threshold to a positive, non-zero integer. Any other value will leave the batch disabled.
- Click Save.